Board stones
Warning: Use of undefined constant b - assumed 'b' (this will throw an Error in a future version of PHP) in /home/boooeller/web/beton-nova.com.ua/public_html/wp-content/themes/contractor-pro/functions.php on line 173
Warning: Use of undefined constant c - assumed 'c' (this will throw an Error in a future version of PHP) in /home/boooeller/web/beton-nova.com.ua/public_html/wp-content/themes/contractor-pro/functions.php on line 175
Warning: Use of undefined constant c - assumed 'c' (this will throw an Error in a future version of PHP) in /home/boooeller/web/beton-nova.com.ua/public_html/wp-content/themes/contractor-pro/functions.php on line 175
GOST - 6665-91
Warning: Use of undefined constant c - assumed 'c' (this will throw an Error in a future version of PHP) in /home/boooeller/web/beton-nova.com.ua/public_html/wp-content/themes/contractor-pro/functions.php on line 175
Warning: Use of undefined constant c - assumed 'c' (this will throw an Error in a future version of PHP) in /home/boooeller/web/beton-nova.com.ua/public_html/wp-content/themes/contractor-pro/functions.php on line 175
OKP code - 57 4612, 58 4621
Border stones (borders, curbs).
Developed by Bridge Building Committee and Principal Moscow Architecture Committee attached to Moscow executive Committee. Approved by USSR Construction Committee. Resolution dated 03.04.91 № 13.
Consecutive number | Product Brand | Dimensions, mm | Concrete brand | Consumption of materials | Products weight, t | |||
---|---|---|---|---|---|---|---|---|
L | B/t | h | Concrete, m3 | Steel, kg | ||||
1 | БР100.30.15 | 1000 | 170/100 | 300 | 400 | 0,043 | 0,40 | 0,1 |
2 | БР300.30.15 | 3000 | 170/100 | 300 | 400 | 0,126 | 6,56 | 0,315 |
3 | БР100.20.8 | 1000 | 90/70 | 200 | 300 | 0,016 | 0,58 | 0,04 |
BS – Border stones
Border stones BS100.30.15 and BS300.30.15 are designed for local passages roadway separation from sidewalks and lawns.
Border stone BS 100.20.8 is designed for footpaths and sidewalks separation from lawns.